Basement: Day 8
The water, sewer, and 1 of 3 heat ducts are boxed in together now on this wall. It may look a little wider than needed, but we wanted to keep the lines flush with structure on the opposite wall to minimize "step" shapes. Electrician Brian was in for his first work day on site and got all the outlets, switches, and basic light fixtures roughed in.
Labels: Construction