Greg (General) and Brian (Electrical) put in a big day and it shows: Middle post is framed and overhead box is complete, including cold air return to the closet (where it will be used to vent hot air from the equipment and also be brought to ground level as the primary return for the main area). Subfloor under the stairs is done. All the electrical is wired and all the outlets, switches, and lights are roughed in, including the stairs lights.